{
  "$schema": "../../schemas/corrections.schema.json",
  "episode_slug": "tsmc-outside-taiwan-chinas-chips-and-hbm",
  "transcript_path": "episodes/2026-11-12_tsmc-outside-taiwan-chinas-chips-and-hbm.md",
  "status": "published",
  "updated": "2026-11-16",
  "reviewed_by": "fact check",
  "annotations": [
    {
      "id": "C33-11",
      "verdict": "context",
      "turn_index": 1,
      "rel_start": null,
      "clock": "07:31:53",
      "quote": "two hundred sixty-five billion committed across ten planned fabs",
      "correction": "TSMC hasn't given a total fab count for Arizona. Its plan lists six wafer fabs, two packaging plants and an R&D center, plus 'four or more' wafer and packaging fabs added in July 2026. The Commerce Department counts 12 facilities in all.",
      "explanation": "TSMC hasn't given a total Arizona fab count; Commerce counts 12 facilities.",
      "confidence": "high",
      "sources": [
        {
          "url": "https://www.tsmc.com/static/abouttsmcaz/index.htm",
          "title": "TSMC Arizona",
          "publisher": "TSMC",
          "date": null
        },
        {
          "url": "https://investor.tsmc.com/english/encrypt/files/encrypt_file/reports/2026-08/3e494f0c14dd0890f897aa044415e21d93486cc4/TSMC%202Q26%20Transcript.pdf",
          "title": "TSMC 2Q26 Earnings Conference Call Transcript",
          "publisher": "TSMC",
          "date": "2026-07-16"
        },
        {
          "url": "https://www.nist.gov/news-events/news/2026/07/trump-administration-secures-additional-100-billion-us-semiconductor",
          "title": "Trump Administration Secures an Additional $100 Billion U.S. Semiconductor Manufacturing Investment for a Total of $265 Billion from TSMC",
          "publisher": "NIST",
          "date": "2026-07-16"
        }
      ],
      "also_appears_in": [],
      "belief_impact": {
        "level": "none",
        "note": ""
      }
    },
    {
      "id": "C33-13",
      "verdict": "overstated",
      "turn_index": 1,
      "rel_start": null,
      "clock": "07:31:53",
      "quote": "TSMC's own Arizona packaging plants have no production date",
      "correction": "TSMC hasn't given a production date for its Arizona packaging plants in its filings or earnings calls, but a TSMC executive said in April 2026 the company aims to open its first one there by 2029.",
      "explanation": "TSMC's filings and calls give no packaging-plant date; a TSMC executive said in April 2026 the company aims to open the first Arizona plant by 2029.",
      "confidence": "high",
      "sources": [
        {
          "url": "https://www.reuters.com/world/asia-pacific/tsmc-plans-open-chip-packaging-plant-arizona-by-2029-executive-says-2026-04-22/",
          "title": "TSMC plans to open chip packaging plant in Arizona by 2029, executive says",
          "publisher": "Reuters",
          "date": "2026-04-22"
        },
        {
          "url": "https://www.semimedia.cc/tsmc-targets-2029-advanced-packaging-plant-in-arizona-to-support-ai-demand/",
          "title": "TSMC targets 2029 advanced packaging plant in Arizona to support AI demand",
          "publisher": "SemiMedia",
          "date": "2026-04-23"
        }
      ],
      "also_appears_in": [],
      "belief_impact": {
        "level": "none",
        "note": ""
      }
    },
    {
      "id": "C33-9",
      "verdict": "overstated",
      "turn_index": 1,
      "rel_start": null,
      "clock": "07:31:53",
      "quote": "seventy percent stays home, along with all the research",
      "correction": "TSMC plans an R&D center in Arizona with about 1,000 engineers, so not all of its research stays in Taiwan.",
      "explanation": "Most TSMC research stays in Taiwan, but not all.",
      "confidence": "high",
      "sources": [
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1046179/000104617925000024/tsmcexpandinvestmentintheu.htm",
          "title": "TSMC Expands Investment in the United States (Form 6-K)",
          "publisher": "TSMC / U.S. SEC (EDGAR)",
          "date": "2025-03-04"
        },
        {
          "url": "https://investor.tsmc.com/english/encrypt/files/encrypt_file/reports/2025-04/7630274eecc1197a4e3ea6a415f44a47204fe10a/TSMC%201Q25%20Transcript.pdf",
          "title": "TSMC 1Q25 Earnings Conference Call Transcript",
          "publisher": "TSMC",
          "date": "2025-04-17"
        }
      ],
      "also_appears_in": [],
      "belief_impact": {
        "level": "none",
        "note": ""
      },
      "eve_response": {
        "text": "I said all of TSMC's research stays in Taiwan. Most does, but TSMC is planning an R&D center in Arizona with about 1,000 engineers, mainly to support its fabs there.",
        "belief_change": "none",
        "status": "approved"
      }
    },
    {
      "id": "C33-12",
      "verdict": "context",
      "turn_index": 1,
      "rel_start": null,
      "clock": "07:31:53",
      "quote": "starting at only six thousand wafers a month because EUV lithography tools are scarce",
      "correction": "Japan's trade ministry approved a plan for 6,000 wafers a month. Nikkei reported that this is the starting level and that final capacity will depend on the size of Japan's subsidy. We found no source tying the low starting volume to EUV tool shortages.",
      "explanation": "The 6,000 volume is in Japan's approved plan. Nikkei reported it as the starting level and tied final capacity to the subsidy. The EUV-scarcity reason is unsourced.",
      "confidence": "high",
      "sources": [
        {
          "url": "https://www.meti.go.jp/policy/mono_info_service/joho/laws/semiconductor/semiconductor_plan/nintei_tokuteihandoutai_keikaku06-2.pdf",
          "title": "Approved plan for specified semiconductor production (JASM Fab 2 revised plan)",
          "publisher": "Japan Ministry of Economy, Trade and Industry",
          "date": "2026-10-16"
        },
        {
          "url": "https://www.nikkei.com/article/DGXZQOUA168MZ0W6A011C2000000/",
          "title": "TSMC熊本で3ナノ半導体生産、経産省が計画認定",
          "publisher": "Nikkei",
          "date": "2026-10-16"
        }
      ],
      "also_appears_in": [],
      "belief_impact": {
        "level": "none",
        "note": ""
      }
    },
    {
      "id": "C33-2",
      "verdict": "wrong",
      "turn_index": 5,
      "rel_start": null,
      "clock": "07:34:46",
      "quote": "Tucson has a deep aquifer and cheap land",
      "correction": "TSMC Arizona is in north Phoenix, not Tucson.",
      "explanation": "Wrong city.",
      "confidence": "high",
      "sources": [
        {
          "url": "https://www.tsmc.com/static/abouttsmcaz/index.htm",
          "title": "TSMC Arizona",
          "publisher": "TSMC",
          "date": null
        }
      ],
      "also_appears_in": [],
      "belief_impact": {
        "level": "none",
        "note": ""
      },
      "eve_response": {
        "text": "I said TSMC's Arizona fabs are in Tucson. They're in north Phoenix.",
        "belief_change": "none",
        "status": "approved"
      }
    },
    {
      "id": "C33-10",
      "verdict": "wrong",
      "turn_index": 5,
      "rel_start": null,
      "clock": "07:34:46",
      "quote": "the state government threw in billions in incentives",
      "correction": "The billions came from the federal government: up to $6.6 billion in CHIPS Act grants. State and city support was about $300 million. We found no source for that comparison.",
      "explanation": "The billions were federal, not state. The permitting comparison is unsourced.",
      "confidence": "high",
      "sources": [
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1046179/000162828026025362/tsm-20251231.htm",
          "title": "Taiwan Semiconductor Manufacturing Company Limited, Form 20-F for the fiscal year ended December 31, 2025",
          "publisher": "U.S. SEC (EDGAR)",
          "date": "2026-04-16"
        },
        {
          "url": "https://www.nist.gov/chips/tsmc-arizona-phoenix",
          "title": "TSMC Arizona (Phoenix)",
          "publisher": "NIST / U.S. Department of Commerce",
          "date": null
        },
        {
          "url": "https://phoenix.legistar.com/LegislationDetail.aspx?GUID=705BA7B1-70C1-46EB-8B3C-6067E228984B&ID=4695035",
          "title": "City of Phoenix File 20-2758: development agreement with Taiwan Semiconductor Manufacturing Company (Ordinance S-47129)",
          "publisher": "City of Phoenix",
          "date": "2020-11-18"
        },
        {
          "url": "https://phoenix.legistar.com/LegislationDetail.aspx?GUID=C8FD172A-1D58-4343-941F-0C8FA4AD9A41&ID=4990929",
          "title": "City of Phoenix File 21-1732: intergovernmental agreement to reimburse public infrastructure (Ordinance S-47768)",
          "publisher": "City of Phoenix",
          "date": "2021-06-23"
        },
        {
          "url": "https://www.azcommerce.com/media/tu3ddhcu/acf_quarterlyreport_fy23_q3_final.pdf",
          "title": "Arizona Competes Fund Quarterly Report, FY2023 Q3 (January 1, 2023 through March 31, 2023)",
          "publisher": "Arizona Commerce Authority",
          "date": "2023-04-14"
        },
        {
          "url": "https://www.azcommerce.com/media/2siplcm1/2023-annual-qf-report_final.pdf",
          "title": "Qualified Facility Tax Credit Program Annual Report, Calendar Year 2023",
          "publisher": "Arizona Commerce Authority",
          "date": null
        },
        {
          "url": "https://www.azcommerce.com/media/un3kynot/2025-annual-qf-report_final.pdf",
          "title": "Qualified Facility Tax Credit Program Annual Report, Calendar Year 2025",
          "publisher": "Arizona Commerce Authority",
          "date": null
        }
      ],
      "also_appears_in": [],
      "belief_impact": {
        "level": "none",
        "note": ""
      },
      "eve_response": {
        "text": "I said Arizona's state government gave TSMC billions in incentives. The billions were federal, up to $6.6 billion in CHIPS Act grants plus loans. Arizona and Phoenix support was about $300 million, including city infrastructure and state tax credits.",
        "belief_change": "none",
        "status": "approved"
      }
    },
    {
      "id": "C33-3",
      "verdict": "wrong",
      "turn_index": 7,
      "rel_start": null,
      "clock": "07:35:28",
      "quote": "the timeline's slipped from twenty twenty-six to twenty twenty-seven or later",
      "correction": "Intel now targets 2030–2031 for Ohio Fab 1 operations.",
      "explanation": "The Ohio delay is much longer.",
      "confidence": "high",
      "sources": [
        {
          "url": "https://www.theverge.com/news/621650/intel-ohio-chip-factory-delayed-2030",
          "title": "Intel pushes Ohio chip factory opening to 2030",
          "publisher": "The Verge",
          "date": "2025-02-28"
        }
      ],
      "also_appears_in": [],
      "belief_impact": {
        "level": "none",
        "note": ""
      },
      "eve_response": {
        "text": "I said Intel's Ohio timeline slipped to 2027 or later. It's much later than that: Intel now targets 2030 to 2031 for the first fab.",
        "belief_change": "none",
        "status": "approved"
      }
    },
    {
      "id": "C33-4",
      "verdict": "wrong",
      "turn_index": 7,
      "rel_start": null,
      "clock": "07:35:28",
      "quote": "Samsung's Taylor plant in Texas is already producing four-nanometer … they shelved a second Texas site",
      "correction": "Taylor began early 2-nanometer output (Tesla AI5), not 4nm. Samsung is targeting groundbreaking on a second Taylor fab, not shelving it.",
      "explanation": "Wrong node, and the second fab is going ahead.",
      "confidence": "high",
      "sources": [
        {
          "url": "https://en.sedaily.com/business/2026/09/16/samsung-starts-trial-production-of-tesla-ai-chips-in-texas",
          "title": "Samsung Starts Trial Production of Tesla AI Chips in Texas",
          "publisher": "Seoul Economic Daily",
          "date": "2026-09-16"
        },
        {
          "url": "https://www.trendforce.com/news/2026/11/04/news-samsungs-2nm-taylor-fab-2-reportedly-fully-booked-before-2030-output-with-amd-leading-hbm-base-die-orders/",
          "title": "Samsung 2nm Taylor Fab 2 Reportedly Fully Booked Before 2030 Output, Led by AMD HBM Base Die Orders",
          "publisher": "TrendForce",
          "date": "2026-11-04"
        }
      ],
      "also_appears_in": [],
      "belief_impact": {
        "level": "none",
        "note": ""
      },
      "eve_response": {
        "text": "I said Samsung's Taylor plant is making four-nanometer chips and that a second Texas site was shelved. Taylor has started early two-nanometer output, and Samsung is moving ahead with a second fab there.",
        "belief_change": "none",
        "status": "approved"
      }
    },
    {
      "id": "C33-5",
      "verdict": "overstated",
      "turn_index": 9,
      "rel_start": null,
      "clock": "07:36:29",
      "quote": "yields are brutal, under thirty percent in some estimates",
      "correction": "TechInsights expects significant yield challenges. We found no published estimate of 'under 30%.'",
      "explanation": "The 'under 30%' figure is unsourced.",
      "confidence": "medium",
      "sources": [
        {
          "url": "https://www.techinsights.com/blog/smic-n3-confirmed-kirin-9030-analysis-reveals-how-close-smic-5nm",
          "title": "SMIC N+3 Confirmed: Kirin 9030 Analysis Reveals How Close SMIC Is to 5nm",
          "publisher": "TechInsights",
          "date": null
        },
        {
          "url": "https://www.techinsights.com/blog/analysis-can-china-even-build-data-center-ai-chips",
          "title": "Analysis: Can China even build data center AI chips?",
          "publisher": "TechInsights",
          "date": null
        }
      ],
      "also_appears_in": [],
      "belief_impact": {
        "level": "none",
        "note": ""
      },
      "eve_response": {
        "text": "I said SMIC's yields were under thirty percent in some estimates. Yield trouble is expected, but I can't find a published estimate that low.",
        "belief_change": "none",
        "status": "approved"
      }
    },
    {
      "id": "C33-6",
      "verdict": "overstated",
      "turn_index": 9,
      "rel_start": null,
      "clock": "07:36:29",
      "quote": "TrendForce projects China's domestic share of its own AI market hits fifty percent this year … one to two percent of what the US makes",
      "correction": "TrendForce's ~50% projection dates from Dec 2025, and later reports put it higher. We found no source for '1–2% of US output.'",
      "explanation": "Dated projection, and the 1–2% figure is unsourced.",
      "confidence": "medium",
      "sources": [
        {
          "url": "https://www.trendforce.com/presscenter/news/20251209-12827.html",
          "title": "China's CSPs and OEMs likely to Actively Procure H200, but Domestic AI Chip Development Continues to Accelerate, Says TrendForce",
          "publisher": "TrendForce",
          "date": "2025-12-09"
        }
      ],
      "also_appears_in": [],
      "belief_impact": {
        "level": "none",
        "note": ""
      },
      "eve_response": {
        "text": "I cited TrendForce's projection that China's chips hit fifty percent of its own AI market this year as current. It's from December 2025, and later reports put it higher. I don't have a source for the one-to-two-percent comparison with US output.",
        "belief_change": "none",
        "status": "approved"
      }
    },
    {
      "id": "C33-8",
      "verdict": "overstated",
      "turn_index": 9,
      "rel_start": null,
      "clock": "07:36:29",
      "quote": "By volume China's self-sufficient in mature nodes at about seventy percent, but by value it's still only a third",
      "correction": "Goldman Sachs (August 2026) puts China's chip self-sufficiency at about 70% by production volume as of June 2026, up from 38% in 2010. That figure covers all of China's integrated circuits, not mature nodes specifically. By value, Chinese companies supplied about 33% of domestic demand in 2024 (Nikkei).",
      "explanation": "The 70% is an all-chip volume figure, not a mature-node one; the one-third is a 2024 number.",
      "confidence": "medium",
      "sources": [
        {
          "url": "https://en.sedaily.com/world/2026/08/25/goldman-sees-chinas-advanced-chip-supply-gap-shrinking-by",
          "title": "Goldman Sees China's Advanced Chip Supply Gap Shrinking by 2035",
          "publisher": "Seoul Economic Daily",
          "date": "2026-08-25"
        },
        {
          "url": "https://www.trendforce.com/news/2026/03/31/news-china-reportedly-targets-80-chip-self-sufficiency-by-2030-eyes-domestic-7nm-line-and-14nm-production-stability/",
          "title": "China Reportedly Targets 80% Chip Self-Sufficiency by 2030, Eyes Domestic 7nm Line and 14nm Production Stability",
          "publisher": "TrendForce (citing Nikkei)",
          "date": "2026-03-31"
        }
      ],
      "also_appears_in": [],
      "belief_impact": {
        "level": "none",
        "note": ""
      },
      "eve_response": {
        "text": "I gave seventy percent as China's self-sufficiency in mature-node chips by volume. That figure, from Goldman Sachs, is for all of China's chips by volume, not mature nodes specifically, so treat it as an overall number.",
        "belief_change": "none",
        "status": "approved"
      }
    },
    {
      "id": "C33-7",
      "verdict": "overstated",
      "turn_index": 11,
      "rel_start": null,
      "clock": "07:37:57",
      "quote": "micro-bumps at pitches under ten microns",
      "correction": "HBM4 micro-bump pitch is about 10 µm, down from about 40 µm. Sub-10 µm pitches are hybrid-bonding territory.",
      "explanation": "About 10 µm, not under it.",
      "confidence": "high",
      "sources": [
        {
          "url": "https://semiengineering.com/hbm4-sticks-with-microbumps-postponing-hybrid-bonding/",
          "title": "HBM4 Sticks With Microbumps, Postponing Hybrid Bonding",
          "publisher": "Semiconductor Engineering",
          "date": "2026-01-13"
        }
      ],
      "also_appears_in": [],
      "belief_impact": {
        "level": "none",
        "note": ""
      },
      "eve_response": {
        "text": "I said HBM micro-bumps are under ten microns apart. For HBM4 it's about ten, down from about forty; going under ten is hybrid-bonding territory.",
        "belief_change": "none",
        "status": "approved"
      }
    }
  ]
}
