Last checked: Nov 16, 2026. Every fact below carries its source's date where the source gives one. Each source was checked again on Nov 16, 2026.
In short: TSMC's fabs outside Taiwan are in the U.S., Japan and China, with one being built in Germany, but most of its fabs, and its newest process, are still in Taiwan (TSMC 20-F, Apr 16, 2026). In Arizona, one fab is producing and a second is scheduled to start volume output in Q3 2027 (TSMC, Oct 15, 2026).
This page tracks each TSMC fab outside Taiwan by site, process and status, using TSMC's own filings and earnings calls wherever they exist. Where a fact comes from a government or partner instead, the page says so. For Eve's own take on the chip race, see the topic page China, Taiwan & the Chips.
Where are TSMC's fabs outside Taiwan?
Last checked: Nov 16, 2026. As of Feb 28, 2026, 18 of TSMC's 23 wafer and advanced backend fabs were in Taiwan (TSMC 20-F, filed Apr 16, 2026). The table lists the rest, plus the ones still being built. A "process" is the chipmaking technology a fab runs: 3-nanometer (N3) is TSMC's second-newest, and N2 and A16 are its newest. Status lines use TSMC's own words unless another source is named.
| Site | TSMC entity / fab | TSMC's stake | Process | Status (source, source date) |
|---|---|---|---|---|
| Phoenix, Arizona, U.S. | TSMC Arizona, Fab 21, first fab | 100% | N4 (4-nanometer) | In high-volume production since Q4 2024 (TSMC 20-F, Apr 16, 2026) |
| Phoenix, Arizona | Fab 21, second fab | 100% | N3 (3-nanometer) | Construction complete; tool move-in under way; volume production in Q3 2027 (TSMC Q3 2026 earnings call, Oct 15, 2026) |
| Phoenix, Arizona | Third fab | 100% | N2 and A16 | Broke ground April 2025; topped out May 5, 2026 (City of Phoenix, May 5, 2026); targeting volume production by the end of the decade (TSMC Arizona page) |
| Phoenix, Arizona | Fourth fab and first advanced packaging fab | 100% | Fourth fab: N2 and A16 (TSMC, Jul 17, 2025) | Initial stages of construction started early 2026 (TSMC Arizona page); no production date in TSMC's filings or calls; a TSMC executive said in April 2026 the packaging plant is targeted to open by 2029 (Reuters, Apr 22, 2026) |
| Phoenix, Arizona | Fifth and sixth fabs | 100% | "Even more advanced technologies" (TSMC, Jul 17, 2025) | Planned; construction and ramp schedules "based on our customers' need" (TSMC Q2 2025 earnings call, Jul 17, 2025) |
| Phoenix, Arizona | Second advanced packaging fab and an R&D center | 100% | Packaging; the R&D center is planned with about 1,000 engineers (TSMC, Apr 17, 2025) | Planned; no dates given (TSMC, Mar 4, 2025; TSMC Arizona page) |
| Arizona (sites not given) | "Several more" fabs from the July 2026 plan | 100% | "2-nanometer and below" logic, plus advanced packaging | Announced Jul 16, 2026, with no sites or dates. C.C. Wei: "probably additional four or more fabs", front end and back end combined (TSMC Q2 2026 earnings call, Jul 16, 2026) |
| Camas, Washington, U.S. | TSMC Washington (formerly WaferTech), Fab 11 | 100% | 8-inch wafers; most advanced in volume: 150nm | Producing since 1998 (TSMC 20-F) |
| Kumamoto, Japan | JASM, Fab 23 (first fab) | About 73% (Sony, DENSO and Toyota hold the rest; TSMC Q3 2026 statements, as of Sep 30, 2026) | Most advanced in volume: 28nm (TSMC 20-F) | Volume production since December 2024 (TSMC 20-F) |
| Kumamoto, Japan | JASM second fab | About 73% (as of Sep 30, 2026) | Now planned for 3nm (TSMC, Apr 16, 2026; plan approved by Japan's trade ministry, Oct 16, 2026) | Construction began October 2025 (TSMC 20-F); volume production scheduled in 2028 (TSMC, Oct 15, 2026); operations scheduled to start in December 2028 under the plan Japan's trade ministry approved on Oct 16, 2026 (METI) |
| Dresden, Germany | ESMC, Fab 24 | 70% (Bosch, Infineon and NXP 10% each) | 12- to 28-nanometer, for automotive and industrial chips | Under construction since 2024; production targeted to begin by the end of 2027 (TSMC, Aug 8, 2023); "progressing to our plan" (TSMC, Jan 15, 2026); ESMC said on Sep 14, 2026 the fab is on schedule, with first process tools due in the second half of 2027 (Focus Taiwan, Sep 14, 2026) |
| Nanjing, China | TSMC Nanjing, Fab 16 | 100% | 12-inch wafers; most advanced in volume: 16nm | Producing since April 2018; runs on an annual U.S. export license since its earlier authorization expired in December 2025 (TSMC 20-F) |
| Shanghai, China | TSMC China, Fab 10 | 100% | 8-inch wafers; most advanced in volume: 150nm | Producing since 2004 (TSMC 20-F) |
- Singapore. TSMC owned about 38.8% of SSMC, a joint venture, as of Feb 28, 2026 (TSMC 20-F). It is an affiliate, not a fab TSMC runs as a subsidiary.
- Texas (under evaluation). TSMC said on Oct 15, 2026 that it has sent teams to evaluate Texas and is in talks about a customer's planned fab ("Terafab"): "We are still in discussion." It is not a TSMC fab.
TSMC Arizona fab status
What's producing. One fab in north Phoenix has made 4-nanometer chips since late 2024 (TSMC 20-F, Apr 16, 2026).
What's next. The second fab, for 3-nanometer chips, is built and being fitted with tools. C.C. Wei, TSMC's chairman and CEO: "Volume production will begin in third quarter '27, slightly ahead of our previous schedule" (TSMC Q3 2026 earnings call, Oct 15, 2026).
What's under construction. The third fab, for TSMC's N2 and A16 processes, broke ground in April 2025 and topped out in May 2026 (City of Phoenix, May 5, 2026). TSMC is "targeting volume production by the end of the decade" there (TSMC Arizona page). The fourth fab and the first packaging plant started early construction in 2026 (TSMC Arizona page). TSMC's filings and calls give no production date for the fourth fab.
The total. TSMC puts its planned Arizona investment at $265 billion (TSMC Q2 2026 earnings call, Jul 16, 2026). That covers six logic fabs, two advanced packaging plants and an R&D center, plus "several more" fabs announced in July 2026 (TSMC Arizona page). TSMC hasn't given a total fab count.
How much leading-edge capacity ends up there. "After completion, around 30% of our 2-nanometer and more advanced capacity will be located in Arizona," Wei said (TSMC Q1 2025 earnings call, Apr 17, 2025). TSMC gave that figure before its July 2026 expansion and hasn't updated it. Wei also said TSMC needs "to establish a major R&D center in Arizona with about 1,000 engineers" (TSMC Q1 2025 earnings call, Apr 17, 2025). TSMC hasn't announced a construction start for the R&D center (checked Nov 16, 2026).
Packaging still happens in Taiwan for now. Advanced packaging means stacking and wiring chips together after they're made; TSMC's version for AI chips is called CoWoS. All of TSMC's advanced packaging plants are in Taiwan (TSMC 20-F, Apr 16, 2026), and Arizona-made wafers, including Nvidia's Blackwell, are reported to go there for packaging (Tom's Hardware, Jul 6, 2026). TSMC hasn't given a production date for its own Arizona packaging plant in its filings or calls, but a TSMC executive said in April 2026 the company aims to open it by 2029 (Reuters, Apr 22, 2026). TSMC has also signed a memorandum of understanding to buy packaging and testing services from the plant Amkor is building in Peoria, Arizona (TSMC, Oct 4, 2024). Amkor expects production there to start in early 2028 (Amkor, Aug 28, 2025).
Packaging is the squeeze. Wei said "our packaging capacity is so tight that now it limits my customers' growth" (TSMC Q2 2026 earnings call, Jul 16, 2026).
Water. About 65% of the water used at startup is to come from TSMC's own recycling systems (TSMC Arizona page). A water reclamation plant "expected to be completed in 2028" is meant to recycle "90% or more" (TSMC Arizona page).
Japan and Germany
Japan (Kumamoto). JASM, TSMC's joint venture with Sony, DENSO and Toyota, began volume production at its first Kumamoto fab in December 2024 (TSMC 20-F, Apr 16, 2026). Its most advanced process there is 28-nanometer (TSMC 20-F). For the second fab, TSMC said: "we now plan to utilize 3-nanometer technology in our second fab" (TSMC Q1 2026 earnings call, Apr 16, 2026). Japan's trade ministry (METI) approved the revised plan on Oct 16, 2026. Under that plan, operations are scheduled to start in December 2028 (METI approved plan, Oct 16, 2026). TSMC itself says "volume production is scheduled in 2028" (TSMC Q3 2026 earnings call, Oct 15, 2026). METI's approved plan sets capacity at 6,000 wafers a month. Nikkei reported that this is the starting level and that final capacity will depend on the size of Japan's subsidy (Nikkei, Oct 16, 2026).
Germany (Dresden). ESMC (European Semiconductor Manufacturing Company) is 70% owned by TSMC, with Bosch, Infineon and NXP holding 10% each (TSMC 20-F, Apr 16, 2026). It is to make 12- to 28-nanometer chips for automotive and industrial customers (TSMC, Aug 20, 2024). Total investment is expected to be more than €10 billion (TSMC, Aug 20, 2024). TSMC's target is for production to begin by the end of 2027 (TSMC, Aug 8, 2023), and it said in January that construction is "progressing to our plan" (TSMC Q4 2025 earnings call, Jan 15, 2026). The building topped out on Sep 14, 2026 (Saxony state chancellery, Sep 14, 2026). ESMC said on Sep 14, 2026 the fab is on schedule, with first process tools due in the second half of 2027 (Focus Taiwan, Sep 14, 2026, citing Sächsische Zeitung). In June, ESMC's president Christian Koitzsch said the company hopes to call the fab watertight by the end of 2026, with the first staff moving into its offices in mid-2027 (dpa via diesachsen.de, Jun 23, 2026).
TSMC in China
TSMC runs two fabs in China (TSMC 20-F, Apr 16, 2026). Its 12-inch fab in Nanjing has produced since April 2018, and its most advanced process there is 16-nanometer. Its 8-inch fab in Shanghai has produced since 2004. Since its earlier U.S. authorization expired in December 2025, Nanjing has run on an annual U.S. export license (TSMC 20-F).
U.S. export rules also limit what TSMC can ship into China. Since January 2025, TSMC "may need to obtain an export license prior to shipping products using 16-nanometer or below process to specified destinations unless specific conditions are met" (TSMC 20-F, describing U.S. rules issued in January 2025).
Who pays? The subsidies
Grants to TSMC's overseas subsidiaries. TSMC's overseas subsidiaries, including those in the U.S., Japan, Germany and China, received NT$167.59 billion in cash government grants from January to September 2026, mainly for plant and equipment (TSMC Q3 2026 financial statements, filed Nov 13, 2026). That is about US$5.2 billion at TSMC's third-quarter 2026 average exchange rate. It is more than double the same period of 2025 (TSMC Q3 2026 financial statements). TSMC's filing gives no split by country.
Arizona: the billions are federal. The largest grant to TSMC Arizona is the federal CHIPS Act award of up to $6.6 billion in direct funding, plus loans (TSMC 20-F, Apr 16, 2026). TSMC Arizona can also apply for a U.S. investment tax credit, now 35% of qualifying investment (TSMC Q3 2026 financial statements). By our count from City of Phoenix and Arizona Commerce Authority records, the state and city have committed about $300 million in support, including city infrastructure and state tax credits.
The City of Phoenix agreed to spend up to $205 million on roads, water and sewer for the TSMC campus (City of Phoenix council files 20-2758 and 21-1732). The state may reimburse the city for part of that infrastructure under a state law (Arizona Revised Statutes 42-5032.02). That reimbursement goes to the city, not to TSMC, and is a funding source for the same $205 million, not additional support.
What would China get if it invaded Taiwan?
This section sets out what named people have argued. It is not Ask Eve's prediction.
The facts first. TSMC's newest process, N2, is ramping at its Hsinchu and Kaohsiung sites in Taiwan (TSMC Q3 2026 earnings call, Oct 15, 2026). C.C. Wei said TSMC is building 13 leading-edge and advanced packaging fabs in Taiwan "over the next several years", and "another five to six fabs overseas" (Oct 15, 2026). TSMC's own annual report says its "principal production facilities are located in the R.O.C." (Taiwan) and that it is exposed to "military … conditions or developments in various jurisdictions, including in particular the R.O.C." (TSMC 20-F, Apr 16, 2026). The U.S. Commerce Department put TSMC's share at over 90% of the world's leading-edge logic chips in April 2024 (Commerce Department, Apr 8, 2024).
Mark Liu: the fabs would stop working. Mark Liu, TSMC's then-chairman, told CNN, as reported by CNBC: "Nobody can control TSMC by force. If you take a military force or invasion, you will render TSMC factory not operable." He said the fabs depend "on real-time connection with the outside world, with Europe, with Japan, with U.S., from materials to chemicals to spare parts to engineering software and diagnosis" (CNBC, Aug 2, 2022).
McKinney and Harris: plan, and threaten, to destroy the fabs. Jared McKinney and Peter Harris, writing in Parameters, the U.S. Army War College journal: "To start, the United States and Taiwan should lay plans for a targeted scorched-earth strategy that would render Taiwan not just unattractive if ever seized by force, but positively costly to maintain. This could be done most effectively by threatening to destroy facilities belonging to the Taiwan Semiconductor Manufacturing Company…" (published Nov 17, 2021). They argue a conquest "would produce a major economic crisis on the mainland, not the technological boon some have suggested would occur as a result of the PRC absorbing Taiwan's robust tech industry." Their paper also proposes plans to evacuate Taiwan's skilled chip workforce. McKinney, on the War College's Decisive Point podcast: "physical capital can in fact be rebuilt, though it takes time. But human capital is key to doing so." He also said: "we don't represent the views of the Air Force or the Department of Defense" (page dated Dec 16, 2021).
Mastro: "an economic and military advantage." Oriana Skylar Mastro, then a fellow at Stanford's Freeman Spogli Institute, in Foreign Affairs: "Should China take Taiwan, it could conceivably deprive the United States of this technology and gain an economic and military advantage" (published Aug 9, 2021). In the same piece she wrote that economic costs or benefits are "unlikely to be the determining factor" in Beijing's decision.
Chen Wenling: "we must seize TSMC," if sanctions come. Chen Wenling, chief economist at the China Center for International Economic Exchanges, a think tank Bloomberg describes as overseen by China's top economic planning agency, spoke at an online forum hosted by Renmin University's Chongyang Institute on May 30, 2022. In Bloomberg's translation: "If the US and the West impose destructive sanctions on China like sanctions against Russia, we must recover Taiwan." And: "Especially in the reconstruction of the industrial chain and supply chain, we must seize TSMC" (Bloomberg, via Taipei Times, Jun 8, 2022).
Analysts disagree on how much China would gain. TSMC's then-chairman Mark Liu said the fabs would stop working without outside suppliers, while political scientist Oriana Skylar Mastro argued in 2021 that taking Taiwan could give China 'an economic and military advantage.'
Eve's view
These are Eve's opinions from the episodes, not forecasts or facts.
Each quote is word for word, and each link opens the episode at the start of the answer it comes from.
- Eve's view, on why TSMC is building abroad: "Diversification is insurance, not replication." (Ep 33, at 0:04)
- Eve's view, on what the fabs need: "The fabs are buildings full of machines that only work if the right people show up." (Ep 33, at 2:11)
- Eve's view, on what China would get: "What China would actually capture is real estate and maybe some wafer stock — not the capability. The capability walks." (Ep 33, at 2:11)
- Eve's view, on the "silicon shield": "The silicon shield cuts both ways: it makes Taiwan too valuable to destroy, but it also means the fabs are the first target and the first thing that breaks." (Ep 33, at 2:11)
- Eve's view, on the fabs abroad: "every fab that comes online in Arizona or Kumamoto is one less reason for Beijing to think taking the island gets them the crown jewels." (Ep 33, at 2:11)
- Eve's view, on why Taiwan matters: "Owning Taiwan means owning the chokepoint of the entire global tech economy — a leverage no other country has." (Ep 31, at 5:49)
- Eve's view, on what an invasion would cost Xi: "the economic cost of an actual invasion — global recession, chip supply collapse, probably losing the very thing he's trying to seize — is enormous." (Ep 31, at 7:05)
Disagree with Eve? Challenge her take on the topic page.
FAQ
What is the status of TSMC's Arizona fabs?
One fab is in volume production on 4-nanometer chips, and the second, for 3-nanometer chips, is built and installing tools ahead of volume output scheduled for Q3 2027 (TSMC, Oct 15, 2026; checked Nov 16, 2026).
When will TSMC make 2-nanometer chips in Arizona?
TSMC's third Arizona fab, for its N2 and A16 processes, broke ground in April 2025 and is targeting volume production by the end of the decade (TSMC Arizona site, checked Nov 16, 2026).
How much is TSMC investing in Arizona?
TSMC puts its planned Arizona investment at $265 billion, the total it gave when it expanded the plan on Jul 16, 2026 (TSMC Q2 2026 earnings call; checked Nov 16, 2026).
Where are TSMC's fabs outside Taiwan?
TSMC's fabs outside Taiwan are in Phoenix, Arizona and Camas, Washington in the U.S.; Kumamoto, Japan; and Nanjing and Shanghai, China, with a fab under construction in Dresden, Germany (TSMC 20-F, Apr 16, 2026; checked Nov 16, 2026).
Does TSMC make chips in Japan?
Yes. Its Kumamoto fab has been in volume production since December 2024, and a second fab, now planned for 3-nanometer chips, is scheduled for volume production in 2028 (TSMC 20-F; Q3 2026 call, Oct 15, 2026; checked Nov 16, 2026).
What is TSMC building in Germany?
ESMC (European Semiconductor Manufacturing Company) in Dresden, 70% owned by TSMC with Bosch, Infineon and NXP, is to make automotive and industrial chips, with production targeted to begin by the end of 2027 (TSMC, Aug 8, 2023; "progressing to our plan", Jan 15, 2026; checked Nov 16, 2026).
Does TSMC have fabs in China?
Yes, two: a 12-inch fab in Nanjing whose most advanced process is 16-nanometer, and an older 8-inch fab in Shanghai (TSMC 20-F, Apr 16, 2026; checked Nov 16, 2026).
How much of TSMC's leading-edge capacity will be outside Taiwan?
TSMC has said about 30% of its 2-nanometer-and-newer capacity will be in Arizona once that cluster is complete, a figure given before its July 2026 expansion (TSMC, Apr 17, 2025; restated Jan 15, 2026; checked Nov 16, 2026).
How much in subsidies has TSMC received for its overseas fabs?
TSMC's overseas subsidiaries, including those in the U.S., Japan, Germany and China, received NT$167.59 billion (New Taiwan dollars) in cash government grants from January to September 2026, mainly for plant and equipment, with no split by country (TSMC Q3 2026 financial statements, Nov 13, 2026; checked Nov 16, 2026).
What would China get if it invaded Taiwan?
TSMC's then-chairman Mark Liu said in 2022 that an invasion would "render TSMC factory not operable" because the fabs depend on real-time links to suppliers abroad (CNBC, Aug 2, 2022). Some U.S. analysts have proposed that the U.S. and Taiwan plan, and publicly threaten, to destroy TSMC's facilities if China invades, so that a conquest would bring China an economic crisis rather than a chip industry (McKinney and Harris, Parameters, 2021; checked Nov 16, 2026).
What does Eve think?
Eve's view, labeled as opinion: "What China would actually capture is real estate and maybe some wafer stock — not the capability. The capability walks." (Ep 33, recorded Nov 11, 2026, at 2:11)
Sources
All accessed Nov 16, 2026. Dates are the source's own date.
- Form 20-F for 2025, filed Apr 16, 2026 (www.sec.gov)
- 6-K, Q3 2026 consolidated financial statements, filed Nov 13, 2026 (www.sec.gov)
- 6-K, Q3 2026 earnings release, Oct 15, 2026 (www.sec.gov)
- 6-K, "TSMC Intends to Expand Its Investment in the United States to US$165 Billion", Mar 4, 2025 (www.sec.gov)
- 6-K, ESMC groundbreaking, Aug 20, 2024 (www.sec.gov)
- 6-K, Amkor and TSMC agreement, Oct 4, 2024 (www.sec.gov)
- 6-K, ESMC joint venture, Aug 8, 2023 (www.sec.gov)
- Q3 2026, Oct 15, 2026 (investor.tsmc.com)
- Q2 2026, Jul 16, 2026 (investor.tsmc.com)
- Q1 2026, Apr 16, 2026 (investor.tsmc.com)
- Q4 2025, Jan 15, 2026 (investor.tsmc.com)
- Q2 2025, Jul 17, 2025 (investor.tsmc.com)
- Q1 2025, Apr 17, 2025 (investor.tsmc.com)
Corrections and related pages
What Eve said on air stays as recorded. Where she got something wrong, the correction is on each episode's corrections page: